The inspection is the skilled part. The typing up isn't.
A residential surveyor spends the day inspecting and the evening writing it up. The write-up follows the same structure every time, but it takes hours, and it's often done tired.
In this demo, the surveyor's only job on site is to talk. The skill does the first draft.
Messy notes in. A structured report out.
What goes in
- Voice note
- A transcript of the surveyor walking round the property. It's deliberately messy: it repeats itself, jumps between rooms and changes a condition rating mid-way through.
- The client's instruction email, with the names, the survey level and what's been asked for.
- Request
- One line: "Please prep a level 2 report."
What comes out
- Report
- A first draft Level 2 home survey report across all 28 elements, in a RICS-style structure.
- Ratings
- One rating 3, ten rating 2, eleven rating 1 and six not inspected. The one serious issue, a rear boundary retaining wall, is flagged with a structural engineer's report recommended before exchange.
- Queries
- 15 numbered questions at the end of the document, plus a short list in the chat of what's still missing, such as a surname, the year of inspection and the surveyor's details.
It's built not to invent things, but it still needs checking.
The skill is designed to ask questions rather than guess, and anything it can't find in the voice note or the email is left as a placeholder and raised as a numbered query.
AI can still get things wrong, so every report needs checking before it goes out, and the surveyor who sends it is responsible for what it says.
We treat it the same as a first draft from a junior surveyor, which you wouldn't send to a client without reading it properly.
Built around your templates and your process.
The demo uses a basic RICS template found online. For a real firm, it's set up around your own report templates at each level, and around what your surveyors capture on site.
That starts with about an hour with each surveyor, going through how they work and what changes between levels. It may also mean small changes to how notes are captured on site, so the reports come out right first time.
The same approach works well beyond home surveys: anything where messy inputs, such as voice notes, emails, typed notes or documents from other parties, become a structured report, plan or letter.
Common questions.
Does it work for Level 1 and Level 3 surveys?
Yes. The skill is built to produce Level 1, 2 or 3 reports. This demo shows Level 2.
Can it get things wrong?
Yes. It's built to ask questions and flag gaps rather than fill them, but AI can still make mistakes. That's why everything gets checked before it goes out, the same as you would check work from a trainee or a junior member of staff.
Can it use our own report template?
Yes. The demo uses a generic RICS structure. Setting it up for your firm means building it around your own templates and standard wording.
Who signs off the report?
The surveyor, who is responsible for what the report says. The output is a first draft for review, not a finished report.
Do we need to change how we work on site?
Mostly no. You talk through the inspection as you go. Sometimes small changes to what gets captured on site make the drafts more accurate, and we'd look at that together.